Frank Street, Peterborough — framing complete, August 2026.
Framing under way, July 2026.
The four townhomes from the rear, August 2026.
Aerial, August 2026.
First walls up, July 2026.
The site from the street.
Product
Four townhomes, 4 rental homes
Status
Under construction
Metrosuite's role
Construction manager
Ownership
Third-party ownership entity, affiliated with Metrosuite
Delivery method
Site-built (wood frame)
Years
2026
Four family-sized rental townhomes in Peterborough. Framing and roofing were completed in August 2026; mechanical and electrical rough-ins, siding and site servicing are under way as of September 2026.
Frank Street is a deliberate exception to the modular default. The site, the unit type and the local trade base favoured a conventional build, and the choice was made at feasibility. Modular is how Metrosuite delivers most of its housing; housing is the point, and the method follows the site.
Milestones
Structural framing complete
August 2026
Roof complete
August 2026
Services and interiors
In progress
Completion
Late 2026, planned
As of September 2026. Planned dates depend on manufacturer and municipal schedules and are updated as they change.